Swindon24 TV
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon 24 | Swindon News
  • News
    • Politics
    • Sport
    • Business
  • Swindon24 TV
  • Columnists
  • About + Contact
    • About us
    • Contact us
    • Advertise
    • Complaints
No Result
View All Result
Swindon 24 | Swindon News
No Result
View All Result
Home News

Check Before You Travel as upgrade work takes place between Swindon and Bristol

bySwindon 24
18 August 2017 • 8.05am
bristol-parkway

Image by National Rail

FacebookWhatsAppXBlueskyLinkedIn

Passengers travelling between South Wales, Bristol Parkway and London Paddington are reminded to Check Before You Travel from this weekend as Network Rail prepares to undertake a series of major upgrades and electrification work on the line between Swindon and Bristol Parkway.

Network Rail will undertake electrification work in Chipping Sodbury and Alderton tunnels as well as beginning the construction of a new platform at Bristol Parkway to enable Great Western Railway (GWR)’s new fleet of Intercity Express Trains to operate. These brand new trains will deliver over a fifth more seats per train, more frequent services and reduced journey times for passengers.

To take place from Saturday 19 August to Friday 15 September, the work is a key part of the modernisation of the Great Western mainline, allowing the new trains to run.

The upgrade includes the installation of the Overhead Line Equipment (OLE) used to hold the wires for electrification, platform upgrades at Bristol Parkway station and the introduction of a flood resilience scheme at Chipping Sodbury to make the railway more reliable.

Network Rail’s major programmes director David Buisson said:

“The upgrade between Swindon and Bristol Parkway is vital as we continue to deliver electrification and a more reliable railway for our passengers.

“I’d like to thank residents living near to the railway and passengers for their continued support throughout the modernisation work which forms part of our Railway Upgrade Plan.”

GWR operations director Rob Mullen said:

“The work in the Bristol Parkway area is a crucial part of Network Rail’s Great Western mainline upgrade which, with the roll-out our new fleet of Intercity Express Trains, will provide the greatest step-change in experience for our passengers in a generation.

“It is an exciting time with new trains due to enter service in a matter of months. This work is key to delivering the full benefits these new trains will bring.”

Bristol Parkway will remain open throughout, but there will be no trains calling at the station from 2-15 September. A full list of service amendments is available here: http://www.GWR.com/BristolParkway2017.

Passengers can check their journeys before travelling at www.nationalrail.co.uk and www.GWR.com

For more information on GWR’s new trains please click here.

READ MORE

Swindon’s only comic shop celebrates 15 years in town centre

Swindon’s only comic shop celebrates 15 years in town centre

30 April 2026 • 11.05am
Swindon aim for play-offs despite Holloway suspension

Swindon aim for play-offs despite Holloway suspension

29 April 2026 • 10.27pm
Royal Wootton Bassett auction house wins SME award

Royal Wootton Bassett auction house wins SME award

29 April 2026 • 10.05pm
Top journalists confirmed for Swindon summit in November

Top journalists confirmed for Swindon summit in November

29 April 2026 • 6.25pm
Improvised whodunnit marks 90 years of Town Gardens Bowl

Improvised whodunnit marks 90 years of Town Gardens Bowl

29 April 2026 • 6.18pm
Swindon runners part of record London Marathon day

Swindon runners part of record London Marathon day

29 April 2026 • 6.16pm
Load More

TOP STORIES

Swindon MP makes bold speech about future of UK defence
News

Swindon MP makes bold speech about future of UK defence

27 April 2026 • 7.53pm

Speaking at the Swindon Defence Networking and Insights event at STEAM Museum of the Great Western Railway on Friday, Mr...

Read moreDetails
Swindon runners part of record London Marathon day

Swindon runners part of record London Marathon day

29 April 2026 • 6.16pm
GLL returns to Oasis but housing hurdle remains

GLL returns to Oasis but housing hurdle remains

29 April 2026 • 9.10am
Reform UK relaunch in Swindon under fresh leadership

Reform UK relaunch in Swindon under fresh leadership

12 April 2026 • 2.49pm
Parish turns felled tree into stunning park bench artworks

Parish turns felled tree into stunning park bench artworks

9 April 2026 • 9.17am
Developer joins debate on Swindon’s economic future

Developer joins debate on Swindon’s economic future

3 April 2026 • 3.43pm
Education Secretary says “phones have no place in class”

Education Secretary says “phones have no place in class”

24 April 2026 • 7.03pm
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon news.

All content © State Six News Limited, unless otherwise stated. All rights reserved. Swindon 24 is a trading style of State Six News Limited. Company number: 16190242. Registered company address: Suite A, 82 James Carter Road, Mildenhall, Suffolk, IP28 7DE.

  • HOMEPAGE
  • VIDEO