Swindon24 TV
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon 24 | Swindon News
  • News
    • Politics
    • Sport
    • Business
  • Swindon24 TV
  • Columnists
  • About + Contact
    • About us
    • Contact us
    • Advertise
    • Complaints
No Result
View All Result
Swindon 24 | Swindon News
No Result
View All Result
Home News

Over 3,400 more seats on GWR services through Swindon

bySwindon 24
3 January 2018 • 10.05am
FacebookWhatsAppXBlueskyLinkedIn

Massive increase in train seats this morning as GWR delivers new trains.

Great Western Railway (GWR) provided more than 3,400 extra trains seats through Swindon this morning with the continued introduction of new Intercity Express Trains (IET) into passenger service.

From today GWR has introduced 16 more Intercity Express Train services from Swindon to London Paddington, and 16 going west towards Bristol and South Wales on top of the existing IET services that were launched last October.

Each train has as many as 24% more seats than the High Speed Train it replaces.

GWR Managing Director Mark Hopwood said:

“Today marks a massive step towards delivering the capacity improvements we have promised, and the biggest fleet upgrade in a generation.

“I am delighted to see even more IETs enter service, enabling us to make further improvements throughout our network, and supporting the communities we serve.

“Let me also take this opportunity to thank our passengers for their patience while travelling during the Christmas period, as Network Rail continued its programme to modernise the Great Western.”

Following the successful completion of Network Rail’s Christmas engineering works, the addition of new trains mark a significant milestone in the modernisation of the Great Western.

The trains are being built by the 900-strong workforce at Hitachi’s North East factory in Newton Aycliffe, as part of the Government’s £5.7bn Intercity Express Programme.

In total 36 x 5 carriage trains and 21 x 9 carriage are being built with all trains due in service by December 2018, and a significant timetable change in January 2019 realising the full capacity and frequency benefits the new trains will bring. Journey times from Bristol will be slashed by up to 17 minutes, and by up to 14 minutes from Swansea.

New electric only Class 387 Electrostar trains are also now in operation under electric power between Didcot, Reading, and station stops towards London Paddington – with some services running with as many as 12 carriages.

Network Rail Western route managing director Mark Langman said:

“This is another major step forward in the biggest ever transformation on the Great Western Mainline as we deliver more trains, more seats and better journeys for communities across the route.

“This will boost local communities and provide a better service for passengers travelling in Didcot, Reading, across the Thames Valley and west London.

“It has been a real team effort as Network Rail and GWR staff worked tirelessly to get to this stage. It is an example of track and train working together for the benefit of the passenger and really does herald an exciting time on the railway.”

With the provision of all electric services to Didcot customers travelling towards Oxford will need to change at Didcot Parkway for a shuttle service to Oxford/Banbury. Customers travelling towards Reading will need to change at Didcot Parkway for services towards London Paddington.

READ MORE

Swindon24 to host live election debate as candidates face residents questions

Swindon24 to host live election debate as candidates face residents questions

1 May 2026 • 3.51pm
Swindon’s only comic shop celebrates 15 years in town centre

Swindon’s only comic shop celebrates 15 years in town centre

30 April 2026 • 11.05am
Swindon aim for play-offs despite Holloway suspension

Swindon aim for play-offs despite Holloway suspension

29 April 2026 • 10.27pm
Royal Wootton Bassett auction house wins SME award

Royal Wootton Bassett auction house wins SME award

29 April 2026 • 10.05pm
Top journalists confirmed for Swindon summit in November

Top journalists confirmed for Swindon summit in November

29 April 2026 • 6.25pm
Improvised whodunnit marks 90 years of Town Gardens Bowl

Improvised whodunnit marks 90 years of Town Gardens Bowl

29 April 2026 • 6.18pm
Load More

TOP STORIES

Swindon care homes show highs and lows in new report
News

Swindon care homes show highs and lows in new report

29 April 2026 • 6.11pm

Research by training provider High Speed Training, based on figures from the Care Quality Commission, found 88.38 per cent of...

Read moreDetails
Swindon Explorer launches £4,000 quest for Poland Jamboree

Swindon Explorer launches £4,000 quest for Poland Jamboree

12 April 2026 • 12.42pm
Swindon plumber wins South West title at 2026 awards

Swindon plumber wins South West title at 2026 awards

8 April 2026 • 10.25pm
Row erupts over reality of £101m Swindon cash claim

Row erupts over reality of £101m Swindon cash claim

16 April 2026 • 8.06pm
Purton teen returns to defend London Mini Marathon title

Purton teen returns to defend London Mini Marathon title

23 April 2026 • 10.56pm
Hundreds join first men’s walk for Prospect Hospice in Swindon

Hundreds join first men’s walk for Prospect Hospice in Swindon

18 April 2026 • 11.48am
Swindon’s role in MINI story marked after 25 years

Swindon’s role in MINI story marked after 25 years

23 April 2026 • 12.01am
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon news.

All content © State Six News Limited, unless otherwise stated. All rights reserved. Swindon 24 is a trading style of State Six News Limited. Company number: 16190242. Registered company address: Suite A, 82 James Carter Road, Mildenhall, Suffolk, IP28 7DE.

  • HOMEPAGE
  • VIDEO