Swindon24 TV
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon 24 | Swindon News
  • News
    • Politics
    • Sport
    • Business
  • Swindon24 TV
  • Columnists
  • About + Contact
    • About us
    • Contact us
    • Advertise
    • Complaints
No Result
View All Result
Swindon 24 | Swindon News
No Result
View All Result
Home News

First phase of Akers Way reconstruction nearing completion

bySwindon 24
30 May 2017 • 9.25am
FacebookWhatsAppXBlueskyLinkedIn

Motorists are being given advance warning that the second phase of work to reconstruct Akers Way will start in just under two weeks’ time (12 June).

The contractor working on the project on behalf of Swindon Borough Council has been laying new base materials on the northern section of the carriageway ahead of the final surfacing, which will take place this week.

The first phase of the work is on course to be completed on Friday, 9 June at which point the entire carriageway will be open to all traffic.

This will allow the roundabout outside Farm Foods, at the junction with Moredon Road, Whitworth Road, Cheney Manor Road and The Broadway, to be resurfaced over the weekend of 10 and 11 June.

The following Monday (12 June), phase two of the Akers Way reconstruction will begin and will affect a 200-metre section between the Purton Road roundabout and Nova Hreod Academy. During this work, Akers Way will be closed in both directions.

Drivers are advised that the diversion route for phase two will be: Purton Road, Moredon Road, Cheney Manor Road and Akers Way. Access to the Nova Hreod Academy junction will be maintained during this phase from the east only.

The Council has notified local residents, schools and businesses advising them of the next phase of work and motorists should allow extra time for their journeys or seek an alternative route during this time.

To reduce the impact on Moredon Road, hauliers and businesses serving Cheney Manor Industrial Estate are being asked to avoid the Moredon Road diversion and seek a suitable alternative route.

The work on Akers Way, which has been split up into five phases, is designed to address problems with the deteriorating concrete base of the road.

A complex but cost-effective solution has been devised, which combines modifications to the concrete road base slabs and includes a specially designed thicker road surfacing material layer on top.

The design will increase the flexibility of the road and provide a longer-lasting protective surface over the road structure below. The contractor will also be carrying out improvements to the parking along the road.

Regular updates on the road improvement scheme will be publicised through the Council’s fortnightly Highways News e-newsletter www.swindon.gov.uk/newsletter

Cllr Mary Martin, Swindon Borough Council’s Cabinet Member for Communities and Place, said: “I’m pleased to report that the additional defects found by our engineer after the road surface was dug up have been rectified and it will be great to see the new road surface laid this week.

“This first phase was always going to cause the least amount of inconvenience to drivers and the local community as the majority of Akers Way has remained open.

However, these next few phases will have a significant impact on people’s journeys so I would urge anyone who uses Akers Way or Moredon Road, particularly during peak periods, to consider using alternative routes and to allow plenty of time for their travel.

“I would also encourage people to explore alternative methods of getting from A to B. Our Swindon Travel Choices service has some excellent information about sustainable travel options on their website: www.swindontravelchoices.co.uk”

READ MORE

Fine art auction raises more than £7,500 for Prospect Hospice

Fine art auction raises more than £7,500 for Prospect Hospice

24 October 2026 • 7.20pm
Swindon Town partnership to help disabled people and tackle isolation

Swindon Town partnership to help disabled people and tackle isolation

24 October 2026 • 3.24pm
Conservatives and Reform back asylum motion as council meeting sparks political row

Conservatives and Reform back asylum motion as council meeting sparks political row

24 October 2026 • 2.27pm
Polish pupils surprised by school day differences on Swindon visit

Polish pupils surprised by school day differences on Swindon visit

24 October 2026 • 2.11pm
Work starts on £700,000 plan to turn historic Lydiard House into classrooms

Work starts on £700,000 plan to turn historic Lydiard House into classrooms

24 October 2026 • 2.07pm
Swindon is very close to a major Thames Valley devolution deal

Swindon is very close to a major Thames Valley devolution deal

23 October 2026 • 10.06am
Load More

TOP STORIES

Polish pupils surprised by school day differences on Swindon visit
News

Polish pupils surprised by school day differences on Swindon visit

24 October 2026 • 2.11pm

A group of 56 Polish pupils, aged 13 and 14, visited Lawn Manor Academy to experience lessons, explore the school...

Read moreDetails
Conservatives and Reform back asylum motion as council meeting sparks political row

Conservatives and Reform back asylum motion as council meeting sparks political row

24 October 2026 • 2.27pm
Little Grazey announces major changes as founder hands over business

Little Grazey announces major changes as founder hands over business

14 October 2026 • 7.13pm
Swindon is very close to a major Thames Valley devolution deal

Swindon is very close to a major Thames Valley devolution deal

23 October 2026 • 10.06am
MP calls to block “outrageous” Thames Water deal amid Swindon anger

Swindon MP demands Thames Water is brought into public ownership

22 October 2026 • 2.15am
UkraineFest organisers promoting the annual Ukrainian cultural festival in Swindon.

Swindon misses out on City of Culture 2029 shortlist, but ambition remains

22 October 2026 • 1.57am
Swindon’s Hindu community celebrates ‘Navratri’ with nine nights of dance

Swindon’s Hindu community celebrates ‘Navratri’ with nine nights of dance

17 October 2026 • 7.05am
GALLERY: Paralympic champion shares his toughest battle at New College Swindon graduation

GALLERY: Paralympic champion shares his toughest battle at New College Swindon graduation

16 October 2026 • 11.39pm
Cross-party call for improved safety in Swindon’s parks goes to council vote tonight

Cross-party call for improved safety in Swindon’s parks goes to council vote tonight

22 October 2026 • 2.24am
Inside the £1.2m project breathing new life into the heart of Toothill

Inside the £1.2m project breathing new life into the heart of Toothill

16 October 2026 • 12.46am
  • About us
  • Advertise with us
  • Complaints
  • Contact us
Swindon news.

All content © State Six News Limited, unless otherwise stated. All rights reserved. Swindon 24 is a trading style of State Six News Limited. Company number: 16190242. Registered company address: Suite A, 82 James Carter Road, Mildenhall, Suffolk, IP28 7DE.

  • HOMEPAGE
  • VIDEO